G-13

1922 Mack AB


Delivered: 11/1/1922

Status: Junked 12/3/1957 at House of Correction

Apparatus Assignments

Coal & Supply Wagon 5 (11/1922 - 12/1922)
Oil Wagon 4 (1923 - ?)
Steam Thawing Unit (before 2/22/1956 - 12/3/1957)

Additional spare assignments for this apparatus may appear on the Company History page

Apparatus Notes

2-ton chassis; may have been Supply Wagon 5 until 1923; former Oil Supply wagon (gas truck) converted to Steam Thawing Unit with boiler from scrapped steam engine and used to thaw out frozen fire apparatus; conversion date unknown, as shop records do not indicate change

Additional Images