Delivered: 11/2/1927
Status: Junked 8/14/1956 at House of Correction
Engine Co. 40 Hose Wagon (11/1927 - 4/25/1928) |
High Pressure 3 (4/25/1928 - 8/14/1928) |
High Pressure 5 (8/14/1928 - 12/28/1949) |
High Pressure 4 (11/28/1950 - 5/12/1955) |
Additional spare assignments for this apparatus may appear on the Company History page
First apparatus delivered with an enclosed cab; converted to High Pressure at CFD shops before assignment; Engine 40 Hose Wagon end date may have been 7/10/1928; equipped with 2 deck guns and carried 2000’ of 3-1/2” hose; name change only from Engine 40 Hose Wagon to High Pressure 3; High Pressure 5 end date may have been 1/16/1950; High Pressure 4 end date may have been 5/1956